Measure the area, multiply by the depth, and add 10 to 15 percent for compaction and waste. A driveway 6 metres long and 4 metres wide laid 100 millimetres deep needs 2.4 cubic metres before any allowance, and about 2.7 cubic metres once you add 10 percent — roughly 4.1 tonnes of gravel. The rest of this guide shows the formula, the depths for driveways, patios and paths, and the mistakes that cause most short orders.
How do you calculate how much gravel you need?
The calculation has three steps, and the most common mistake is skipping the third. First, find the area: multiply length by width, in the same units. Second, multiply the area by the depth to get the volume. Third, add an allowance for compaction, settling, and spillage. Written out, the formula is:
Volume (m³) = Length (m) × Width (m) × Depth (m)
If you work in feet and inches, the same formula in cubic yards is Volume (yd³) = Length (ft) × Width (ft) × Depth (in) ÷ 324. The 324 comes from converting inches to feet (divide by 12) and cubic feet to cubic yards (divide by 27): 12 × 27 = 324. A square foot of gravel 4 inches deep is 1/81 of a cubic yard, which is why the table below works out to 81 square feet per cubic yard at that depth.
The gravel calculator runs the same volume math and converts the result into cubic metres and tonnes, so you can check your hand calculation against it before ordering. It is worth running both ways: if the calculator and your own arithmetic disagree, one of them has a unit wrong, and finding out before the lorry arrives is a lot cheaper than finding out after.
Worked example: a driveway
Take a driveway 6 metres long and 4 metres wide, with gravel laid 100 millimetres deep.
Step 1 — area. 6 × 4 = 24 square metres.
Step 2 — volume. 100 millimetres is 0.100 metres, so 24 × 0.100 = 2.4 cubic metres.
Step 3 — add the allowance. A driveway takes car traffic and compacts, so allow 10 percent: 2.4 × 1.10 = 2.64 cubic metres. Round up to 2.7 cubic metres to order.
Step 4 — convert to weight. At a loose density of 1,550 kilograms per cubic metre, 2.64 × 1.55 = 4.09 tonnes, so about 4.1 tonnes. If your supplier sells by the bulk bag, each bag holds about 850 kilograms, or roughly 0.55 cubic metres, so 2.64 ÷ 0.55 = 4.8 — order 5 bags.
The same driveway in feet and inches: 20 feet by 13 feet is 260 square feet. At 4 inches deep, 260 × 4 ÷ 324 = 3.21 cubic yards, so order 3.5 cubic yards with the allowance. At about 1.2 tonnes per cubic yard, that is roughly 3.9 tonnes, or 4.2 US tons. The two routes agree within rounding — pick one system and stay in it for the whole job.
How deep should gravel be?
Depth is decided by what drives or walks on the gravel, not by how it looks. A garden path takes foot traffic only, so 50 to 75 millimetres is enough. A patio needs 75 to 100 millimetres, because chairs and table legs concentrate weight on small points. A driveway needs 100 to 150 millimetres of gravel over a compacted sub-base of crushed stone, and the sub-base itself should be another 100 to 150 millimetres. A French drain is different again: the stone is the drain, so it fills the trench, usually 300 millimetres deep around the pipe.
| Depth | Area covered by 1 m³ | Area covered by 1 yd³ |
|---|---|---|
| 50 mm (2 in) | 20.0 m² | 162 sq ft |
| 75 mm (3 in) | 13.3 m² | 108 sq ft |
| 100 mm (4 in) | 10.0 m² | 81 sq ft |
| 150 mm (6 in) | 6.7 m² | 54 sq ft |
The table reads both ways: it tells you how far one unit goes, and it exposes how fast the order grows with depth. Raising a patio from 50 to 100 millimetres doubles the volume, so a depth error is the most expensive mistake in the whole calculation — measure the depth you actually intend to lay, not the depth you hope is enough.
How much does a cubic yard of gravel weigh?
Weight follows from volume through density, and density varies more than most people expect. Loose gravel weighs about 1,400 to 1,600 kilograms per cubic metre; 1,550 is a sound working figure for crushed stone and pea gravel alike. Converted, one cubic yard weighs about 1.2 tonnes, or roughly 2,600 pounds. Wet gravel weighs more — rain-soaked stone can add several percent — and dense granite weighs more than light limestone at the same size.
The practical rule is simple: use your supplier's stated density, not a generic figure. The gap between 1.4 and 1.6 tonnes per cubic metre is 14 percent of the order, which on a driveway is the difference between enough and a second delivery. The gravel calculator uses 1,550 kilograms per cubic metre as its default, so if your supplier quotes a different density, adjust the weight result by the ratio of the two figures.
Do you need to add extra for compaction?
Yes, and the amount depends on traffic. Loose gravel settles by roughly 10 to 20 percent as it is walked and driven on, with the biggest drop in the first few weeks. A patio that only sees foot traffic needs about 10 percent extra; a driveway that takes cars every day needs 15 percent. Irregular ground adds more again, because every hollow in the subgrade is filled with gravel you did not measure for.
The allowance is not waste in the usual sense — the stone is still there, just packed tighter. That is why ordering the exact measured volume always leaves the surface thin: the volume you measured was loose, and the volume in place after a month is compacted. Buy the allowance up front; a top-up delivery of half a cubic metre costs nearly as much in delivery charges as a full load.
Does the type of gravel change the amount?
The volume formula does not change with gravel type — a cubic metre is a cubic metre whatever stone fills it — but the density and the behaviour do. Pea gravel is rounded, so it shifts underfoot and needs edging to stay in place; crushed angular stone locks together, compacts less, and suits driveways better. Decorative gravel is usually laid thinner, at 50 millimetres, while a driveway base uses larger 20 to 40 millimetre stone that bears weight without sinking.
What changes is the weight per unit volume and the depth you should lay. A 20 millimetre crushed stone at 1,550 kilograms per cubic metre and a light decorative slate at 1,400 differ by 10 percent in weight for the same volume, so a quote by the tonne buys a different volume depending on the stone. Always convert through the density of the exact product you are ordering, and lay angular stone for driveways — rounded stone migrates under tyres and leaves ruts.
How to measure areas that are not rectangles
Few driveways and patios are perfect rectangles, and the fix is the same as for any area: split the shape into rectangles and add them up. An L-shaped patio is two rectangles; a driveway that widens at the gate is a rectangle plus a triangle, using half the base times the height for the triangle. A curved path can be treated as a rectangle of the same average width — measure the width at three points along the curve and average them.
Measure on site, not from a drawing alone: a driveway drawn as 4 metres wide that is really 4.2 adds 5 percent to the volume. Measure the length along the centre line, not the outer edge, on a curve. And measure the depth after the sub-base is compacted, not before — a sub-base that settles 20 millimetres under the roller takes that much extra gravel to bring the surface back to level.
Practical tips
- Measure the depth after the sub-base is down. A sub-base that settles under the roller takes extra gravel to bring the surface level. Measure depth from the compacted sub-base, not from the bare ground.
- Order one load, not two. A second delivery for a shortfall costs nearly as much in delivery charges as a full load, and a second batch of decorative gravel may not match the colour of the first. The allowance is cheaper than the top-up.
- Edge it before you spread it. Gravel migrates: without edging, a driveway loses stone onto the lawn and a path spreads into the borders. Timber, steel, or stone edging goes in before the gravel, not after.
- Compact in layers on driveways. Lay and compact the sub-base first, then the gravel in two layers, rather than dumping the full depth at once. A single deep layer never compacts evenly and ruts where the tyres run.
- Keep a spare pile. Set aside a wheelbarrow or two from the same delivery for patching ruts and topping up after the first month of settling. Stone from a later batch rarely matches in colour or size.
- Remember this is a quantity count, not groundwork advice. Drainage, sub-base design, and membrane choice decide whether a driveway lasts, and those questions belong to a qualified groundworker, not a calculator.
Try it yourself
Enter your length, width, and depth to get the gravel volume in cubic metres and tonnes for your driveway or patio — everything runs locally in your browser, nothing is uploaded.
Frequently asked questions
How much gravel do I need for a 10 by 10 foot patio?
A 10 by 10 foot patio is 100 square feet. At 3 inches deep, the volume is 100 times 3 divided by 324, which is 0.93 cubic yards, so order 1 cubic yard. That is about 1.2 tonnes of gravel. Add 10 percent if the ground is uneven or the edges irregular, which brings the volume to just over 1 cubic yard, so order 1.1 to be safe. In metric terms, a 3 by 3 metre patio at 75 millimetres deep needs 0.68 cubic metres, so order 0.75 cubic metres.
How deep should a gravel driveway be?
A gravel driveway needs 100 to 150 millimetres (4 to 6 inches) of gravel over a compacted sub-base, with the top 50 millimetres as a finer wearing layer. The sub-base itself is usually another 100 to 150 millimetres of crushed stone, compacted before the gravel goes on. A thin 50 millimetre scatter on bare soil ruts within months, because car tyres push the stone into the soft ground. Depth is the cheapest insurance a driveway gets.
How many tonnes is a cubic metre of gravel?
A loose cubic metre of gravel weighs about 1.4 to 1.6 tonnes, with 1.55 tonnes a good working figure for most crushed stone and pea gravel. One cubic yard is about 1.2 tonnes, or roughly 2,600 pounds. The exact figure depends on the stone type and how wet it is: dense granite weighs more than light limestone, and rain-soaked gravel can add several percent. Always check the density your supplier states before converting an order between volume and weight.
How much gravel do I need for a French drain?
Treat the trench as a box: multiply its length by its width by its depth. A 10 metre trench 300 millimetres wide and 300 millimetres deep needs 10 times 0.3 times 0.3, which is 0.9 cubic metres. The pipe itself takes up very little space, so there is no need to subtract it. Add 10 percent for uneven trench walls and spillage, bringing the order to about 1 cubic metre. Use clean 20 millimetre stone with no fines, so water can pass through the gaps.
Can I order gravel by the tonne instead of by cubic metres?
Yes, and many suppliers prefer it, because they load by weight. Convert your volume first, then multiply by the density: tonnes equals cubic metres times 1.55 for most gravel. A 2.64 cubic metre order is about 4.1 tonnes. If the supplier quotes a different density, use theirs, not a generic figure, because the gap between 1.4 and 1.6 tonnes per cubic metre is 14 percent of the order. For small jobs, bulk bags hold about 850 kilograms, or roughly 0.55 cubic metres each.
Does gravel settle after it is laid?
Yes. Freshly laid gravel settles by roughly 10 to 20 percent over the first weeks, more under car traffic and more again after heavy rain washes the fines down. That is why this guide adds a 10 to 15 percent allowance on top of the measured volume, rather than ordering the exact figure. Expect to top up a new driveway once after a month or two, and keep a small spare pile for patching ruts. Raking the surface back level is part of normal gravel maintenance.