Concrete Calculator

Estimate how much concrete you need for a slab, footing, or pad. Enter the length, width, and depth of a rectangular placement and get the volume instantly — then add a waste allowance so you do not come up short on pour day.

Ad space — place your AdSense unit here after approval.
Construction toolkitSwitch display units and create a printable calculation report.
Calculations use standard engineering formulas. Verify project-specific assumptions, material densities and site conditions before construction decisions.
Your result will appear here.

Concrete Calculator online

Estimate concrete volume from length, width and depth for slabs, pads and other rectangular placements — with the unit conversions, waste allowances and ordering judgement that a raw multiplication leaves out.

Quick answer: Enter length, width and depth to estimate concrete volume for a rectangular placement.

How it works

Concrete volume is length × width × depth: Volume = L × W × D. All three dimensions must use the same unit. If the page is set to metres, enter metres; a 15 cm slab is 0.15 m, not 15. Mixing units (metres for length, centimetres for depth) is the most common mistake and inflates the result 100-fold.

Worked example

A driveway slab 6 m long, 4 m wide, 0.15 m thick: net volume = 6 × 4 × 0.15 = 3.6 m³. Add 5–10% waste for spillage, uneven subgrade, and formwork gaps → 3.8–4.0 m³ to order. In US units: 3.6 m³ × 1.308 ≈ 4.7 yd³ — order 5 yd³ from the batch plant. For small jobs, a standard 80 lb (36.3 kg) bag yields about 0.017 m³, so 3.6 m³ would need roughly 212 bags — a ready-mix truck is cheaper at that scale.

Units

  • 1 m³ = 35.31 ft³ = 1.308 yd³
  • 1 yd³ = 0.7646 m³
  • Thickness: 4 in = 10.16 cm; 6 in = 15.24 cm

Batch plants in the US sell by the cubic yard and charge a short-load fee below their minimum (often 3–4 yd³); plants elsewhere sell by the cubic metre.

Practical tips

  • Measure twice. Re-measure depth at several points — subgrade is rarely perfectly level, and depth errors dominate volume errors.
  • Always round up. Ordering 5% extra is far cheaper than a second delivery.
  • Convert before you type. Enter values in one unit system; do not convert mid-form.
  • This is a quantity estimate, not a mix design. It tells you how much concrete, not the strength grade, slump, or reinforcement your project needs.

Edge cases and limitations

  • Round shapes. The formula here is for rectangles. For a round footing or column base, use the cylinder volume π × r² × depth: a 0.4 m diameter hole 1 m deep is 3.1416 × 0.2² × 1 ≈ 0.126 m³ per footing. Add up all footings, then apply waste.
  • Sloped or dug-out ground. A single depth reading lies on uneven subgrade. Measure the depth on a grid, average the readings, and use that as D — hollows you cannot see are where "missing" concrete goes.
  • Pumping eats volume. A pump line holds roughly 0.2–0.5 m³ that never reaches the forms, and priming wastes more. On pumped jobs, add that on top of the waste percentage rather than inside it.
  • Stairs and triangles. Approximate each step as a triangle (½ × going × rise × width) and sum the steps; a straight flight usually lands near half the volume of the solid block it sits in.
  • What the number is not. Volume says nothing about strength grade, slump, air entrainment or reinforcement — those come from your specification and supplier, not from a quantity estimate.

Privacy and browser processing

The calculation runs entirely in your browser — the dimensions you enter are never uploaded.

Frequently asked questions

How much extra concrete should I order?

Add 5% for flat, well-prepared subgrade and up to 10% for irregular ground, complex formwork, or long pump lines. Round the total up to the nearest half cubic metre (or cubic yard).

How do I convert cubic metres to cubic yards?

Multiply m³ by 1.308. Ordering in the US is usually by cubic yard: 3.6 m³ ≈ 4.7 yd³.

Does the calculator account for reinforcement?

No. Rebar displaces a small amount of concrete (usually under 2% for typical slabs); the waste allowance more than covers it.

Is this suitable for final ordering?

Treat it as a planning estimate. Confirm dimensions against project drawings, check the mix design and specifications with your supplier, and have structural decisions reviewed by a qualified professional.